Solar Phak Prachachon: how to apply for the 50,000 THB grant and 2.20 THB buyback
Solar Phak Prachachon (โซลาร์ภาคประชาชน), the government's household solar programme, pays a 50,000 THB grant in 2026 to each household that installs a 5 to 10 kWp solar system. Registration runs from 27 October 2026 to 31 January 2027 at peoplesolar.mea.or.th or peoplesolar.pea.co.th; the second part of the programme buys surplus power at 2.20 THB per kWh, for up to 5 kW per meter on a 20-year contract, under the NEPC (the National Energy Policy Council, กพช., which sets energy policy) decision of 18 September 2026 [1][2][3]. You apply for each part separately, and a grant recipient cannot also claim the 200,000 THB tax deduction for the same system [1][4].
Key facts
- The 50,000 THB grant is limited to 1 million households and open to Thai nationals who own a residential meter [1][5].
- Installation must be by MEA (the Metropolitan Electricity Authority, กฟน., which supplies Bangkok, Nonthaburi and Samut Prakan), PEA (the Provincial Electricity Authority, กฟภ., which supplies the other 74 provinces) or a registered installer; on 13 November 2026 there were 780 in the MEA area and 719 in the PEA area [5][6][7].
- Apply for grid connection by 31 August 2027 and be connected by 30 September 2027 [1].
- Surplus power sells for 2.20 THB per kWh up to 5 kW per meter; larger systems are allowed, but output above 5 kW is for self-use only [3].
- The government pays the grant to the applicant's PromptPay account, or to the bank if you borrow; GSB, GHB and BAAC lend at 2.5% a year over about 7 years [1].
- On 2 November 2026, 42,666 households had registered successfully in the PEA area [8].
kWp is the peak capacity of the solar panels; kW is the size of the inverter or the system.
The two parts, side by side
| Item | 50,000 THB grant | 2.20 THB buyback |
|---|---|---|
| Run by | Ministry of Interior, through MEA and PEA [5] | Energy Regulatory Commission, buying through MEA and PEA [9][10] |
| System size | 5 to 10 kWp per meter [1] | Any installed size; up to 5 kW per meter exported [3] |
| Application window | 27 October 2026 to 31 January 2027 [1] | 1 July 2026 to 30 November 2027 (PEA area) [9] |
| Channel | peoplesolar.mea.or.th or peoplesolar.pea.co.th [2] | MEA's MyEnergy (myenergy.mea.or.th) or PEA's PPIM [9][10] |
| Installer | MEA, PEA or a registered installer only [1] | The household invests and installs, with equipment meeting the utility's rules [9] |
| Combine with the tax deduction | No [4] | Yes, if you do not take the grant |
Who can apply for the grant
| Condition | Detail |
|---|---|
| Applicant | A Thai national, residential (Type 1) electricity user, whose name matches the meter owner [1] |
| Number of grants | One per person for the whole programme; 1 million in total [1] |
| System | 5 to 10 kWp per meter, new, or an addition of 5 to 10 kWp to an existing system that is not combined with it; panels and an inverter at minimum [1] |
| Location | Rooftop, ground-mounted or floating [1] |
| Tax invoice | Dated 27 October 2026 or later [1] |
| State welfare card holders | May apply, but give up the 315 THB monthly electricity subsidy for 20 years from connection [1][5] |
How to register for the grant
Registration is free. Have an electricity bill showing the meter code and the contract account (CA) number to hand [1][11].
- Go to the website: peoplesolar.mea.or.th for Bangkok, Nonthaburi and Samut Prakan, or peoplesolar.pea.co.th for the other 74 provinces [2].
- Verify your identity through the ThaiID app or by entering your ID card details [1].
- Enter the meter code and contract account number from your bill, with phone number and email [1].
- Choose an installer from the registered list, or select "undecided" [1]. See 10 checks before you hire.
- Choose a package and price (including VAT) [1].
- State the location: rooftop (with roof type), ground or floating [1].
- Say whether you want a loan, and choose a bank [1][11].
- Say whether you want to sell surplus power [1].
- Choose a call-back time [1].
- Review and confirm; the site shows a registration number you can use to check status later [1].
After registration, the installer contacts you to survey, sign the standard contract, install and apply to the utility for connection by 31 August 2027 [1]. See Permits step by step.
How to apply to sell surplus power
Buyback applications are handled first come, first served, by the date and time of a complete application [12]. In the PEA area, the PPIM process runs as follows [9]:
- Create an account and log in to PPIM.
- Submit a sale request, fill in the details and upload a bill dated within the last 3 months.
- PEA checks the documents, emails the result and publishes the selected list within 30 days.
- Pay the fees and submit contract documents within 30 days of selection, or the request is cancelled.
- Sign the power purchase agreement at your local PEA office.
- Install as declared and apply for connection.
- Notify the ERC of the licence exemption.
- PEA inspects the system, changes the meter and runs the first synchronisation test.
- Start commercial operation within 2027.
In the MEA area, applications go through MyEnergy (myenergy.mea.or.th) in six similar steps: online application, document check, published list, fees and contract, post-installation inspection, and meter change [10].
Fees and documents
| Item | Amount | Note |
|---|---|---|
| Grant registration | No fee | Through the MEA or PEA website [1] |
| System inspection (buyback, PEA area) | 2,140 THB incl. VAT | Charged once the application is approved [9] |
| Connection fee (buyback) | Amount not stated in the sources we read | Payable within 30 days of selection [9] |
| Stamp duty on a power of attorney | 30 THB | If someone files on your behalf [13] |
For the buyback, MEA asks for a copy of the meter owner's ID card, inverter documentation, a single line diagram signed by an electrical engineer with a copy of the licence, and a bank account letter. Systems with more than 5 kW of inverter capacity must add export limiting device documents [13].
What a programme installer must give you
Installers working under the programme must give a 7-year installation warranty, clean the panels once a year for 7 years, provide 7 years of fire insurance and lodge a 50,000 THB bank guarantee that the homeowner can claim if the job is not finished within 6 months [5]. The 5 kW reference package costs 140,000 THB, or 90,000 THB after the grant [14]. See market prices in 5 kW prices and company scores in our ranking.
Dates to know
| Date | Event |
|---|---|
| 1 July 2026 | Buyback applications open (MyEnergy and PPIM) [9][10] |
| 18 September 2026 | NEPC raises the target to 10,000 MW and extends contracts from 10 to 20 years [3] |
| 27 October 2026 | Cabinet approval; grant registration opens [1][15] |
| 31 January 2027 | Grant registration closes [1] |
| 31 August 2027 | Last day to apply for connection (grant recipients) [1] |
| 30 September 2027 | Last day to be connected (grant recipients) [1] |
| 30 November 2027 | Buyback applications close in the PEA area [9] |
Common reasons applications fail
- Name does not match the meter owner: correct it at the utility office first [1][9].
- Bill older than 3 months: PPIM needs a bill or proof dated within 3 months [9].
- System smaller than 5 kWp: not eligible for the grant [1].
- Unregistered installer: the grant only covers work by MEA, PEA or registered installers [1].
- Inverter not on the list: brand, model and firmware must match the utility's list [13].
- Fees not paid within 30 days: the buyback request is cancelled [9].
What changed most recently
- 18 September 2026: NEPC raised the buyback target from 5,000 MW to 10,000 MW, extended contracts from 10 to 20 years and allowed households to install on the ground or on water. Agencies were told to set guidelines for amending existing contracts; existing participants do not need to cancel and reapply [3].
- 27 October 2026: grant registration opened [1].
- 2 November 2026: PEA reported 42,666 successful registrations in its area [8].
The ERC's July 2026 buyback notice states a 10-year term, while the NEPC decision of 18 September 2026 extends it to 20 years. We will update this page when the ERC or the utilities publish the amended notice or contract [3][9].
Frequently asked questions
Where do I apply for Solar Phak Prachachon?
Register for the 50,000 THB grant at peoplesolar.mea.or.th for Bangkok, Nonthaburi and Samut Prakan, or peoplesolar.pea.co.th for the other 74 provinces, between 27 October 2026 and 31 January 2027. Apply separately to sell surplus power through MEA's MyEnergy or PEA's PPIM [1][2][9][10].
When and how is the 50,000 THB paid?
The government transfers 50,000 THB to the applicant's PromptPay account if you pay yourself, or to the bank if you take a loan from a participating bank [1]. The sources we read do not state how many days after connection; ask your installer and check status online with your registration number.
What is the buyback rate, and for how long?
2.20 THB per kWh for surplus power up to 5 kW per meter. The July 2026 buyback notice set a 10-year contract, and the NEPC decision of 18 September 2026 extended it to 20 years [3][9]. The scheme is net billing: you use your own power first and sell what is left.
Can I install 10 kW if I can only sell 5 kW?
Yes. The grant covers 5 to 10 kWp, and NEPC states that larger systems are allowed, with surplus bought back up to 5 kW per meter [1][3]. Systems with more than 5 kW of inverter capacity need an export limiting device [13]. See 10 kW prices.
What interest rate do programme loans carry?
Thairath reports that GSB, GHB and BAAC lend at 2.5% a year over about 7 years, and that buyback income can be used to repay [1]. Approval follows each bank's own criteria, so check the latest terms with the bank before choosing.
Can I take the grant and still claim the tax deduction?
No. Applicants must confirm they will not claim the Royal Decree No. 805 tax exemption for the equipment and installation cost, in whole or in part [1][4]. Households with more than 2 Mn THB of net income and an expensive system may gain more from the deduction. See the tax deduction.
Should state welfare card holders apply?
They may apply, but give up the 315 THB monthly electricity subsidy for 20 years from connection, and the meter connected to the solar system cannot be used for that subsidy [1][5]. Compare the bill savings from the system with the 315 THB a month you would give up.
I already have solar. Can I get the grant?
Only for a new addition of 5 to 10 kWp that is not combined with the existing system, with tax invoices dated 27 October 2026 or later [1]. A system completed before that date cannot receive the grant retroactively.
Sources
- Ministry of Interior: Solar Phak Prachachon standard handbook, vol. 1, citizens' handbook, 2026 edition. https://peoplesolar.mea.or.th/assets/documents/project-handbook.pdf Published 27 October 2026, read 16 November 2026. News report: Thairath: Solar Phak Prachachon, 50,000 THB grant, eligibility, registration steps, payment and loans. https://www.thairath.co.th/news/society/2968816 published 28 October 2026, read 13 November 2026
- Ministry of Interior: Solar Phak Prachachon standard handbook, vol. 1, citizens' handbook, 2026 edition. https://peoplesolar.mea.or.th/assets/documents/project-handbook.pdf Published 27 October 2026, read 16 November 2026. News report: Thairath: registration at peoplesolar.mea.or.th or peoplesolar.pea.co.th. https://www.thairath.co.th/news/society/2968870 published 28 October 2026, read 13 November 2026
- Government Public Relations Department, Office of the Prime Minister: NEPC meeting 3/2569 expands Solar Phak Prachachon to 10,000 MW. https://www.prd.go.th/th/content/category/detail/id/39/iid/542862 Published 18 September 2026, read 16 November 2026. News report: Post Today: NEPC expands the programme to 10,000 MW, 20-year contracts, 2.20 THB, up to 5 kW per meter. https://www.posttoday.com/smart-city/748946 published 18 September 2026, read 13 November 2026
- Thai Post: the 50,000 THB grant cannot be combined with the tax deduction. https://www.thaipost.net/economy-news/1097472/ published 29 October 2026, read 13 November 2026
- Ministry of Interior: Solar Phak Prachachon standard handbook, volume 1, public handbook, 2026 edition. https://peoplesolar.mea.or.th/assets/documents/project-handbook.pdf published 27 October 2026, read 13 November 2026
- MEA: registered installers, Solar Phak Prachachon programme (780 companies). https://peoplesolar.mea.or.th/vendor read 13 November 2026
- PEA: registered installers, Solar Phak Prachachon programme (719 companies). https://peoplesolar.pea.co.th/vendors read 13 November 2026
- Daily News: PEA and MEA progress briefing, 42,666 registrations in the PEA area as of 2 November 2026. https://www.dailynews.co.th/news/6326120/ read 13 November 2026
- Thansettakij: applying to PEA's 2026 programme via PPIM, scheme VSPP-RT3-2, 2,140 THB inspection fee. https://www.thansettakij.com/economy/energy/662928 published 2 July 2026, read 13 November 2026
- PPTV: MEA's six steps to apply to sell power through MyEnergy. https://www.pptvhd36.com/news/%E0%B8%9B%E0%B8%A3%E0%B8%B0%E0%B8%8A%E0%B8%B2%E0%B8%AA%E0%B8%B1%E0%B8%A1%E0%B8%9E%E0%B8%B1%E0%B8%99%E0%B8%98%E0%B9%8C/278903 read 13 November 2026
- Thansettakij: MEA's six items to prepare before registering. https://www.thansettakij.com/general-news/672307 published 26 October 2026, read 13 November 2026
- Amarin TV: ERC approves the residential solar buyback notice, first come, first served. https://www.amarintv.com/spotlight/economy/550273 read 13 November 2026
- Thansettakij: selling power to MEA in 2026, equipment and document requirements. https://www.thansettakij.com/general-news/663189 read 13 November 2026
- Ministry of Interior: Solar Phak Prachachon handbook for vendors, 2026 edition (140,000 THB reference package). https://peoplesolar.mea.or.th/assets/documents/vendor-handbook.pdf published 27 October 2026, read 13 November 2026
- Thai PBS Policy Watch: cabinet approves the 50,000 Mn THB Solar Phak Prachachon programme. https://policywatch.thaipbs.or.th/article/economy-310 published 27 October 2026, read 13 November 2026