10 kW solar price in Thailand: 1-phase and 3-phase, November 2026

A 10 kW on‑grid home solar system in Thailand costs about 266,300 to 366,000 THB installed, including VAT. Single-phase packages listed on 13 November 2026 cost 266,300 THB and three-phase packages 294,200 to 366,000 THB, or about 27 to 37 THB per watt [1][2][3][4]. At 10 kWp a home can still use either the 50,000 THB grant or the tax deduction of up to 200,000 THB, but not both [5][6].

Key facts

  • Lowest installed price found: Synnex Solar Roof 10 kW 1-phase via JIB at 266,300 THB, or 26.6 THB per watt [1].
  • The same seller's 3-phase package costs 294,200 THB, 27,900 THB more than 1-phase [2].
  • A 10 kW system produces about 1,040 to 1,210 kWh a month and suits homes with bills of 7,500 THB or more.
  • Exports are capped at 5 kW per meter, so a 10 kW system needs an export limiting device [7][8].
  • At 266,300 THB, a home on a 10,000 THB bill pays back in about 4.4 years and one on a 5,000 THB bill in about 6.0 years.
  • Taxpayers in the 30% band or above gain more from the tax deduction (60,000 to 70,000 THB) than from the 50,000 THB grant.

kWp is the peak capacity of the solar panels; kW is the size of the inverter or the system.

10 kW prices by system type and phase

System type Phase Price range (THB incl. VAT) THB per watt Note
On‑grid 1 266,300 26.6 1 package, installed [1]
On‑grid 3 294,200 to 366,000 29.4 to 36.6 3 packages, installed [2][3][4]
On‑grid (equipment set) 3 259,000 25.9 Listing does not say installation is included [9]
Hybrid with battery 3 489,000 Not calculated Battery capacity and installation not stated [10]

Published 10 kW packages

All prices are as listed on the seller's website on 13 November 2026 and may change after a site survey.

Seller Package Phase Panels Price (THB) THB per watt Installation warranty
Synnex Solar Roof (via JIB) Huawei Max 10 kW 1 LONGi Hi-MO X10 266,300 26.6 Not stated on the listing
Synnex Solar Roof (via JIB) Huawei Max-3 10 kW 3 15 × LONGi Hi-MO X10 294,200 29.4 2 years, 2 cleanings
HomePro (Home Solar) Normal Package XL 3 16 × RISEN 625 W (10.0 kWp) 334,000 33.4 1 year
HomePro (Home Solar) Premium Package XL 3 16 × RISEN 625 W with Huawei optimisers 366,000 36.6 2 years
HomePro (ENERGY LIB) P1 LITE 10 kW 3 Black Magic (count not stated) 259,000 25.9 Not stated

Synnex's package via JIB carries a 15-year panel product warranty and a 30-year output warranty [2]. The ENERGY LIB P1 LITE listing names no inverter, no panel count and does not say whether installation is included, so it is not directly comparable [9].

1-phase or 3-phase?

Choose by the supply your home already has, not by panel size.

  • Homes on 1-phase supply: 10 kW 1-phase packages are sold, 27,900 THB cheaper than the same seller's 3-phase package [1][2]. Ask an engineer to check that your meter and service cable can carry the current; if not, you will need to apply to the utility for a larger meter.
  • Homes already on 3-phase supply: use a 3-phase inverter to spread output across all three phases.
  • Either way: systems with more than 5 kW of inverter capacity need an export limiting device from the utility's list, and above 10 kW a routine test report [7].

What the price includes, and what it usually does not

Included in the installed packages in the table

  • Panels, inverter, smart meter and installation [2][3].
  • Help with permits and output monitoring [3].

Usually excluded, so ask first

  • Roof repairs, a larger meter or a new service cable.
  • Utility fees, such as PEA's 2,140 THB inspection fee for homes that sell power back [11].
  • Batteries, which raise the price sharply.

What moves a 10 kW price up or down

A 10 kW system costs less per watt than a small one because labour and paperwork are spread over more watts. Synnex's 10 kW 1-phase package (26.6 THB per watt) is cheaper per watt than its 5 kW 1-phase package (32.1 THB per watt) [1][12].

  1. Phase: 3-phase costs about 28,000 THB more than 1-phase in the same seller's listings [1][2].
  2. Optimisers: HomePro's Premium package with optimisers costs 32,000 THB more than Normal and carries a 2-year installation warranty instead of 1 [3][4].
  3. Roof area and type: a 10 kWp system of sixteen 625 W panels covers about 41 square metres of panel area and weighs about 445 kg [3].
  4. Battery: a 10 kW all-in-one hybrid package costs 489,000 THB, nearly double the on‑grid packages [10].

How much tax and the grant take off

A 10 kWp system qualifies for both the 50,000 THB grant (5 to 10 kWp, installed by a registered installer, registration by 31 January 2027) and the deduction of the amount paid up to 200,000 THB, but you must choose one [5][6][13].

Marginal tax rate (%) Tax saved (full 200,000 THB deduction) Against the 50,000 THB grant
10 20,000 Grant better by 30,000 THB
20 40,000 Grant better by 10,000 THB
25 50,000 Equal
30 60,000 Deduction better by 10,000 THB
35 70,000 Deduction better by 20,000 THB

The figures assume the deducted income falls in one tax band; a system priced above 200,000 THB is capped at 200,000 THB [6]. See the tax deduction and Solar Phak Prachachon.

How long a 10 kW system takes to pay back

At 266,300 THB, a 10 kW system pays back in about 4.4 years on a 10,000 THB bill and 6.9 years on a 4,000 THB bill in the base case.

Scroll the table sideways to see every column.

Bill per month (THB) Payback at 266,300 THB (years) at 294,200 THB (years) at 334,000 THB (years) at 366,000 THB (years) 25-year net at 266,300 THB (THB)
4,000 6.9 7.6 8.7 9.5 660,000
5,000 6.0 6.6 7.5 8.2 809,000
7,500 4.9 5.4 6.1 6.7 1,038,000
10,000 4.4 4.8 5.5 6.0 1,156,000

Base case: 50% daytime use, 1,350 kWh per kWp per year, the tariff in force from September 2026 including Ft (ค่าเอฟที, the fuel adjustment charge added to every kWh) and VAT, surplus sold at 2.20 THB per kWh up to 5 kW, and one inverter replacement in year 12 (35,000 THB) [8][14]. Without a buyback contract, a 10 kW system on a 5,000 THB bill pays back much more slowly. See the method in Is solar worth it?

How to compare 10 kW quotes

  • Ask for watts per panel and panel count; a 10 kW quote above 37 THB per watt needs a stated reason, such as optimisers or a multi-plane roof.
  • Ask for the brand and model of the export limiting device (EXL) and check it is on the utility's list [7].
  • Ask the quote to state whether a meter upgrade is included.
  • Use the 10 checks before you hire and see company scores in our ranking.

Frequently asked questions

How much does a 10 kW solar system cost in Thailand?

On 13 November 2026, published 10 kW on‑grid packages with installation cost 266,300 THB (1-phase, Synnex via JIB), 294,200 THB (3-phase, Synnex via JIB), and 334,000 THB and 366,000 THB (3-phase, HomePro Home Solar), including VAT, or about 27 to 37 THB per watt [1][2][3][4].

How many kWh does a 10 kW system produce per day?

A 10 kWp rooftop system produces about 34 to 40 kWh a day, or about 1,040 to 1,210 kWh a month in its first year, depending on direction, tilt, shade and location. An MEA (the Metropolitan Electricity Authority, กฟน., which supplies Bangkok, Nonthaburi and Samut Prakan) engineer gives an average of about 4 kWh per day per kWp [15].

Can I sell all the power from a 10 kW system?

No. The residential buyback scheme buys up to 5 kW per meter at 2.20 THB per kWh on a 20-year contract. Larger systems are allowed, but output above 5 kW must be used in the home, and an export limiting device is required [7][8].

Can a 1-phase home install 10 kW?

10 kW 1-phase packages are sold at 266,300 THB [1], but an engineer must confirm that your meter and service cable can carry the current, and an export limiting device is required. If your home already has 3-phase supply, a 3-phase inverter balances output better.

How much roof area does 10 kW need?

A 10 kWp system of sixteen 625 W panels has about 41 square metres of panel area, plus space for walkways and roof edges. The panels weigh about 445 kg in total, about 10.7 kg per square metre [3].

Does a 10 kW system get the 50,000 THB grant?

Yes, if it is no more than 10 kWp per meter, installed by MEA, PEA (the Provincial Electricity Authority, กฟภ., which supplies the other 74 provinces) or a registered installer, registered by 31 January 2027 and connected by 30 September 2027 [5][13]. If you are in the 30% tax band or above, the tax deduction is worth more, and the two cannot be combined.

Is a 10 kW system with a battery worth it?

The 10 kW hybrid package listed on 13 November 2026 costs 489,000 THB, but the listing gives neither battery capacity nor installation terms [10]. For most homes with a buyback contract, on‑grid pays back faster; a battery suits homes with frequent outages or heavy night-time use.

Back to top

Sources

  1. JIB: Synnex Solar Roof Huawei Max 10 kW 1-phase on‑grid, installed, 266,300 THB. https://www.jib.co.th/web/product/readProduct/86303 read 13 November 2026
  2. JIB: Synnex Solar Roof Huawei Max-3 10 kW 3-phase, installed, 294,200 THB, 15 LONGi Hi-MO X10 panels, 2-year installation warranty. https://www.jib.co.th/web/product/readProduct/86304 read 13 November 2026
  3. HomePro: Home Solar 10 kW 3-phase Normal Package XL, 334,000 THB, sixteen 625 W panels, 1-year installation warranty. https://www.homepro.co.th/p/1256865 read 13 November 2026
  4. HomePro: Home Solar 10 kW 3-phase Premium Package XL, 366,000 THB, Huawei optimisers, 2-year installation warranty. https://www.homepro.co.th/p/1256885 read 13 November 2026
  5. Ministry of Interior: Solar Phak Prachachon standard handbook, vol. 1, citizens' handbook, 2026 edition. https://peoplesolar.mea.or.th/assets/documents/project-handbook.pdf Published 27 October 2026, read 16 November 2026. News report: Thairath: Solar Phak Prachachon, 50,000 THB grant for 5 to 10 kWp, not combinable with the tax deduction. https://www.thairath.co.th/news/society/2968816 published 28 October 2026, read 13 November 2026
  6. Royal Gazette: Royal Decree under the Revenue Code on tax exemptions (No. 805), B.E. 2569, vol. 143, part 17A. https://ratchakitcha.soc.go.th/documents/104277.pdf Published 2 March 2026, read 16 November 2026. Revenue Department: new legislation, Royal Decree No. 805, rooftop solar tax measure. https://www.rd.go.th/21221.html Read 16 November 2026. News report: Daily News: rooftop solar tax deduction, up to 10 kW, until 31 December 2028. https://www.dailynews.co.th/news/5659250/ read 13 November 2026
  7. Thansettakij: selling power to MEA in 2026, export limiting device above 5 kW and test report above 10 kW. https://www.thansettakij.com/general-news/663189 read 13 November 2026
  8. Government Public Relations Department, Office of the Prime Minister: NEPC meeting 3/2569 expands Solar Phak Prachachon to 10,000 MW. https://www.prd.go.th/th/content/category/detail/id/39/iid/542862 Published 18 September 2026, read 16 November 2026. News report: Post Today: NEPC sets 2.20 THB buyback for 20 years, up to 5 kW per meter. https://www.posttoday.com/smart-city/748946 published 18 September 2026, read 13 November 2026
  9. HomePro: ENERGY LIB P1 LITE 10 kW 3-phase solar set, 259,000 THB. https://www.homepro.co.th/p/1316526 read 13 November 2026
  10. HomePro: ENERGY LIB P1 AIO 10 kW 3-phase all-in-one solar set, 489,000 THB. https://www.homepro.co.th/p/1316517 read 13 November 2026
  11. Thansettakij: applying to PEA's 2026 programme via PPIM, 2,140 THB inspection fee. https://www.thansettakij.com/economy/energy/662928 published 2 July 2026, read 13 November 2026
  12. JIB: Synnex Solar Roof Huawei Core 5 kW 1-phase, installed, 160,600 THB. https://www.jib.co.th/web/product/readProduct/86301 read 13 November 2026
  13. Ministry of Interior: Solar Phak Prachachon standard handbook, vol. 1, citizens' handbook, 2026 edition. https://peoplesolar.mea.or.th/assets/documents/project-handbook.pdf Published 27 October 2026, read 16 November 2026. News report: Thairath: Solar Phak Prachachon registration 27 October 2026 to 31 January 2027, connection by 30 September 2027. https://www.thairath.co.th/news/society/2968689 read 13 November 2026
  14. Government Public Relations Department: new tariff structure from September 2026. https://www.prd.go.th/th/content/category/detail/id/33/iid/536793 published 30 August 2026, read 13 November 2026
  15. Amarin TV: MEA engineer, average output about 4 kWh per day per kWp. https://www.amarintv.com/spotlight/sustainability/562301 read 13 November 2026